亚洲AV无码专区国产|日本不卡一级片一区视频|亚洲日韩视频欧美|五月天色网站av|在线视频永久免费|五级黄色视频免费观看性|女人看黄色视频的链接|黄网络在线看三级图片|特级一级少妇亚洲有码在线|日本无码高清免费

Home >

System Engineering Contract

2011/1/6 11:33:00 43

System Engineering Contract

Party A: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


Party B: telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone, telephone and telephone:


A friendly negotiation between the two sides has made it possible.

engineering

The following agreements are reached:


1. Party A shall provide Party B with equipment and software for the company.


Total contract price: $, $, $, $, $, and $$


  

among

Software fee: $1 million yuan (capital): capital and trade.


The cost of hardware is RMB.


Project fee.


Two

payment

mode


Party B pays first party's total project advance payment.

A total of $1 million yuan.


Among them, the software fee is $.


The cost of hardware is RMB.


Project cost: $.


After Party A's computer hardware is delivered to Party B's designated place, after Party B points, Party B shall pay all hardware costs to Party A.


After the installation is completed, Party B will pay the remaining sum to Party A within seven days.


All payment methods are cash payment.


3. party a responsibility


(1) Party A completes the software installation and commissioning before the time required by Party B.


(2) the system administrator who is responsible for training party B and the maintenance period of the software are free of charge. The maintenance site is located at the location of party a company.

Within one year, the software provided by Party A was damaged due to the failure of hardware supplied by Party A.


(3) Party A can collect the cost of the expansion part if the functions are extended according to the requirements of Party B.


(4) one year later, Party A will pay the maintenance of the equipment and software for maintenance. The maintenance cost will be RMB yuan / yuan (excluding the cost of replacing equipment and increasing the number of software support points).


4. Party B's responsibility


(1) the material used in the commissioning system of the Party A is only for system testing, and shall not be used for KTV business or any other commercial activities for profit. Otherwise, all civil and criminal liabilities involved shall be borne by Party B.


(2) Party B shall not be responsible for the activities required by Party B for business or other business activities for profit.


(3) Party B shall be responsible for Party A's expenses arising from the damage caused by the system and the need for Party A's on-site service.


5. other matters


(1) software should not be copied; software rights should not be removed, covered or applied.


(2) in accordance with the second provision of this contract, if Party B fails to pay more than the time limit, Party A shall have the right to terminate the contract, and Party A shall not be responsible for the consequences arising therefrom.


6. liability for breach of contract


If both parties fail to do so, they shall be resolved by mutual consultation. If a party breaches or infringements, refer to the relevant laws and regulations of China. If there is any dispute between the two parties, submit it to the people's court for judgment.


7. the contract shall come into force after signature and seal of the representatives of both parties. The original contract is made in duplicate. Each party holds one copy and has the same legal effect.

Statement: this contract is invalid after photocopying or alteration.


Party A: (seal)


Person in charge: Mr. Yu, he is in charge.


The time is: the first, the second and the third.


Location: the first, the second and the third.


Party B: (seal)


Person in charge: Mr. Yu, he is in charge.


The time is: the first, the second and the third.


  地點(diǎn):_______________
  • Related reading

Contract For Feasibility Study Of Construction Projects

Contract template
|
2011/1/6 11:31:00
42

Integrated Kitchen Production Contract

Contract template
|
2011/1/6 11:29:00
57

Repair And Repair Contract

Contract template
|
2011/1/6 11:26:00
35

Criminal Principal Agent Contract

Contract template
|
2011/1/5 13:52:00
84

Exclusive Agency Contract Agreement

Contract template
|
2011/1/5 13:50:00
103
Read the next article

中外來件裝配合同

為了保證雙方履行合同和及時(shí)按合同規(guī)定支付罰款或賠償損失,雙方應(yīng)分別向?qū)Ψ教峁└髯糟y行所出具的保函。