亚洲AV无码专区国产|日本不卡一级片一区视频|亚洲日韩视频欧美|五月天色网站av|在线视频永久免费|五级黄色视频免费观看性|女人看黄色视频的链接|黄网络在线看三级图片|特级一级少妇亚洲有码在线|日本无码高清免费

Home >

Burma'S 9 Priority Industries Must Submit Environmental Management Plans Within The Deadline.

2020/2/19 14:22:00 0

PriorityIndustryFactoryDeadlineEnvironmentManagementPlan

The Burma Investment Commission (MIC) issued a news bulletin on February 4, 2020 to remind investors of the following notices:

(1) Ministry of Natural Resources and Enviro, Burma Ministry of natural resources and environmental protection Nmental Conservation) issued Notice No. 3/2018 in January 10, 2018 on the basis of environmental protection regulations (Notification No.03/2018 ) for the 9 priority industries, the existing plant must submit the environmental management plan within the specified time limit (Enviro). Nmental Management Plan, EMP).

(two) in July 29, 2019, the Ministry of natural resources and environmental protection issued the 116/2019 circular (Notification No. (116/2019)), which should be submitted to the EMP within 6 months after the announcement, and stipulates that the factories that submitted EMP within the specified period will be punished by the thirty-second articles of the environmental protection act or the existing laws.

(3) the Burma Investment Committee (MIC) therefore notified all 9 priority industries that have been granted or approved by MIC to complete the 116/2019 notice and submit EMP to the Ministry of natural resources and environmental protection.

The time required for the 9 priority industries to submit EMP is as follows:

?

Industry distinction

scale

Specified time

One

Production of wine, fruit wine and beer

(Alcohol, wine and beer production)

More than 50000 litres per day.

6 months

Two

Food and beverage processing (Food and beverage processing)

More than 10 tons per day

6 months

Three

Production, preparation and packaging of pesticides

(Pesticide manufacturing, formulation and packaging)

All scale

6 months

Four

Cement and lime Manufactory

(Cement and Lime Manufacturing)

Cement: more than 10 tons per day.

Lime: more than 10 tons per day.

6 months

Five

Textile printing and dyeing factory (Textile and dyeing factory)

More than 1 tons per day

6 months

Six

Foundry industry (Foundry industry):

(1) metal smelters (BA) Se me Tal smelting and refining plant)

(2) manufacture of pig iron and low alloy steel with iron ore or scrap metal (Manufacture of pig iron), raw and low alloy steel from iron iron TAL)

(3) foundry (Foundry)

(4) nonferrous metal melting, blacksmith shop and gold and silver yarn industry (Non-ferrous me) Tal melting, smithy and filigree)

All scale

All scale

?

?

All scale

More than 50 tons per day

?

6 months

6 months

?

?

6 months

6 months

Seven

Leather and leather finishing industry

Tanning and leather finishing

All scale

6 months

Eight

Pulp and paper mill (Pulp and paper mills)

More than 20 tons per day

6 months

Nine

Sugar manufacturing plants (sugar refinery)

Nissan can exceed 50 tons.

6 months

?
  • Related reading

Asia'S Largest Specialized Market For Light Textiles

Industry Overview
|
2020/2/19 14:21:00
19

Burma'S Import And Export Trade Is Still Subject To Foreign Exchange Restrictions.

Industry Overview
|
2020/2/19 14:21:00
0

EU Through The European Free Trade Agreement

Industry Overview
|
2020/2/19 14:21:00
3

Trade Between Burma And Thailand Benefits From Border Bridge Opening And Cross-Border Transport Facilitation Agreements

Industry Overview
|
2020/2/19 14:21:00
1

Low Recovery Rate Of Textile Industrial Parks

Industry Overview
|
2020/2/19 8:49:00
3
Read the next article

UK'S 2019 Annual Import And Export Statistics Report

According to the 2019 annual overseas trade statistics report of the UK customs and Customs Administration (HMRC), total merchandise exports in the UK were 3 in 2019.